EX200-5 Excavator Control Joystick Pusher

  • 1 - 10 Sets
    $9.00
  • 11 - 20 Sets
    $8.00
  • >=21 Sets
    $5.00
Model Number:
EX200-5 Joystick Pusher
Compatible Brand:
ZOOMLION Kubota Herrenknecht Shantui John Deere Sumitomo HITACHI WIRTGEN Sany Terex Atlas Copco Sandvik CNH LIEBHERR MANITOWOC Hyundai Komatsu MANITOU Wacker Neuson Oshkos Kobelco LiuGong Metso VOLVO Doosan Jcb Other XGMA CATERPILLAR Lonking XCMG
Report Suspicious Activity
Overview
Quick Details
Applicable Industries:
hytraulic
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
toparts
Warranty:
Unavailable
After-sales Service Provided:
No after-sales service
Standard or Nonstandard:
Standard
Part Name:
Control Pusher for Excavator
Part NO:
702-16-01450
Related excavator:
KOMATSU,KOBELCO,SUMITOMO,HITACHI,CATERPILLR,CASE,DAEWOO,HYUNDAI,VOLVO
Material:
Copper+Steel+NBR
Delivery time:
3--5 Days
Size:
Standard Size or Customized Size
Supply Ability
Supply Ability:
1000 Set/Sets per Day
Packaging & Delivery
Packaging Details
Carton, Wooden Case, or as Required
Port
HuangPu port

EX200-5 Excavator Control Joystick Pusher

 

Information

Part Name

Excavator for Control Lever Pusher

Materials

Copper+Steel+NBR

Model

EX200-5 Joystick Pusher

Part NO.

702-16-01450

Size/Color

Can be customized according to customer requirements

Application

Excavator

Certification

 ISO9001:2008,  ISO14001:2004

Related excavator

KOMATSU,KOBELCO,SUMITOMO,HITACHI,CATERPILLR

CASE,DAEWOO,HYUNDAI,VOLVO,YBS

MOQ

1sets

Packing

 PP bag, Carton, Wooden Case, or as Required

Transport

SEA,AIR,DHL,UPS,FEDEX,TNT, etc.

Payment

PayPal, Western Union, Money Gram, T/T in advance, L/C at sight, etc

Delivery Time

3-5days

OEM / ODM

Available

Inventory

Large inventory

Core Advantages
1. More than 10 years of industry experience.
2. Good quality.
3. Large Stock,Over 30,000 sizes and more than 1 million pieces in stock.
4. Low Price.
5. Support OEM/ODM order.

 

Main Products

Toparts Seal, specialises in Hydraulic Breaker seal kit, Excavator seal kit, Crane seal kit, Wheel Loaders seal kit, Crawler Dozers seal kit, Pump seal kit, Motor seal kit, Dump Trucks seal kit, Wear Ring/ O-ring / X-ring, Center Swing seal(ROI /SWR), Track adjuster seal(OUY), Control lever and pedal level; PTFE Seals:Rod Seals, Piston Seals, Rotary Seals and more.

 

We have the full range of mould size and stable and high quality production line to ensure delivery,,Welcome OEM/ODM order.  

 

 

 

Various models

HITACHIEX60-1HITACHIZAX55HITACHIEX280-5
HITACHIEX100-1HITACHIZAX70HITACHIEX300-1
HITACHIEX100-3HITACHIZAX120HITACHIEX300-2
HITACHIEX100WD HITACHIZAX130HITACHIEX300-3
HITACHIEX120-1HITACHIZAX160HITACHIEX300-5
HITACHIEX120-2HITACHIZAX200HITACHIEX330-5
HITACHIEX120-3HITACHIZAX210HITACHIEX350-5
HITACHIEX120-5HITACHIZAX230HITACHIEX370-5
HITACHIEX150-5HITACHIZAX230-3HITACHIEX400-1
HITACHIEX160HITACHIZAX240HITACHIEX400-3
HITACHIEX200-1HITACHIZAX240-3HITACHIEX400-5
HITACHIEX200-2HITACHIZAX250HITACHIEX450-3
HITACHIEX200-3HITACHIZAX250-3HITACHIEX450-5
HITACHIEX200-5HITACHIZAX270HITACHIEX700
HITACHIEX210-5HITACHIZAX280HITACHIEX1000
HITACHIEX220-1HITACHIZAX230-6HITACHIZAX480
HITACHIEX220-2HITACHIZAX330HITACHIUH07-3
HITACHIEX220-3HITACHIZAX330-3HITACHIUH07-5
HITACHIEX220-5HITACHIZAX350HITACHIUH07-7N
HITACHIEX230-5HITACHIZAX370HITACHIUH07-7 
HITACHIEX270HITACHIZAX450HITACHIUH08-1
HITACHIEX270-5HITACHIZAX460HITACHIUH-009
HITACHIUH-122HITACHIUH-045HITACHIUH-010
HITACHIUH-123HITACHIUH-083HITACHIUH-012
HITACHIUH-172HITACHIUH-107HITACHIUH-016

 

 

 

 

Large Stock

Over 30,000 sizes and more than 1 million pieces in stock.

Q 1. What is the normal lead time for product orders?

A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10 days, average production time after sample approval is 2-3 weeks.

Q 2. What is your standard packing?

A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 3. What's the payment term?

A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 4. Could you please tell us the month capacity of your products ?

A: It depends on which model, we produce more than 2500 tons rubber materials per month.

Q 5: How to check the quality of the bulk order?

A1: We provide preproduction samples before mass production for all customers if needed.

A2: We provide quality certs such as measurement report, material data sheet, COO, COA, etc. to all customers before delivery.

A3: We accept third party inspection such as SGS, TUV, INTERTEK, BV, etc.

Q 6: What materials are available to produce from your side?

A: NBR, EPDM, SILICONE, FKM, NEOPRENE(CR), NR, IIR, SBR, ACM, AEM, Fluorosilicone(FVMQ), FFKM, Liquid Silicone, Sponge, etc.

Q 7: How to select the raw compound for my application?

A: With years of experience working with a variety of material, we can help select the material that will best suit your needs while keeping material costs in mind.

Q 8:Can you supply different color materials?

A: Yes, we can produce custom molded rubber and silicone rubber products in different colors, the color code will be required in case of an order.

Q 9: What is the life expectancy of the rubber seal?

A: Product life is contingent upon many factors, including environment, cycles, pressure, etc. Maihua Rubber cannot predict seal life under all the varying conditions of operation. Accellerated life testing may be performed by customer to determine expected life, but must be conducted in dynamic application.

Q 10. what kind of certificates you have ?

A1: We have been ISO9001:2008 and ISO14001:2004 certified by SGS .

A2: We have various rubber compounds approved by UL, FDA, NSF, KTW, W270, WRAS, ACS, AS4020, EN681, EN549, ROHS and REACH.

Q 11: Do you use any international standards for the rubber products?

A: Yes, we mainly use ASTM D2000 standard to define the quality of the rubber materials, tolerances as per ISO3302, ISO2768, etc.

Q12: How many shifts per day in the factory?

A: Two shifts per day, 8 hours per shift.

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like